Multi-task mode allows you to enter and manage multiple independent calculation tasks within a single project file. This is useful, for example, when analyzing multiple sections of a retaining wall, several types of foundation footings for a structure, or different design alternatives for a structure. There is no need to create a separate file for each task, and shared data only needs to be entered once.

In most programs, individual tasks are created manually. In programs that allow you to specify an entire structure (e.g., a prefab wall), individual tasks are generated automatically from cross-sections.

Data in GEO5 programs are organized into the following levels:

  • Project contains shared data and individual tasks.
  • Task represents an independent computational model, such as specific cross-section of a structure or a design alternative.
  • Construction Stage represents a particular state within a task, such as a change in loading or groundwater level. In certain programs (FEM, Sheeting check, and Settlement), it represents the construction stage, and its use is mandatory.
  • Calculation is used to evaluate the given stage. Depending on the program, a single stage may contain multiple calculations.

You can switch between tasks using the top bar above the construction stages (each task may have its own construction stages).

The division of data is determined by the position of the individual frames relative to the "Tasks" frame:

  • Data entered in frames above the "Tasks" frame are shared by all tasks. This includes, for example, project information, soil definitions, field test databases, and material databases.
  • Data entered in frames below the "Tasks" frame apply only to the selected task.

The specific division between shared data and task-specific data depends on the program.

Shared data can be used in different combinations across individual tasks. For example, soils are defined once for the entire project, but their assignment to the geological profile can differ from one task to another. This makes it possible to compare the same structure under different geological conditions or different structures with the same geological profile.

Changes to shared data affect all tasks that use that data. For example, modifying soil parameters will affect all tasks in which that soil is used. If the soil needs to have different parameters in a particular task, it must be defined as a separate soil and assigned to the relevant task.